CASE STUDY

Automated Conveyor Line Installation

Complete commissioning of a 150m conveyor line for the food industry.

Montage & Installation|Client: [Groupe Agroalimentaire]

The Challenge

Complex installation in an active production environment with strict time constraints.

  • Installation window limited to 72 hours
  • Integration with existing systems without interruption
  • Strict sanitary standards (HACCP certification)

The NM Solution

Meticulous planning and specialized mobile team with workshop pre-assembly.

  • Pre-assembly and testing in workshop before installation
  • Team of 8 certified technicians working continuously
  • Progressive commissioning with staff training

The Results

68h

Deadline Met

99.2%

Availability

5/5

Client Satisfaction

Do you have a similar industrial project?